Funding sourceMackay Regional Council Natural Environment Levy
VMSQM Funding amount$100,000
In-kind contribution(not documented)
Start date18 December 2014
End date30 June 2015
SummaryThe Gooseponds are a series of man-made water bodies along Janes Creek, surrounded by urban areas and parkland. The area is heavily modified, but remains a very popular recreation area for the residents of Mackay with a network of pathways, exercise equipment, play grounds and other park amenities situated in and around the area. A number of pressures impact directly upon this area including; invasive flora and fauna species, fish passage barriers, and agricultural/urban runoff resulting in variable water quality.
The riparian strip adjacent to the Mackay Regional Soccer Zone in Glenella is extremely narrow and also heavily degraded/modified. 2ha of revegetation works were undertaken along an 800m long section, reinstating the riparian buffer strip up to 15m in width. Benefits
This project aims to:
Lesson(not documented)
Reference ID(none)
Last updated: 1 February 2016 This page should be cited as: Department of Environment, Science and Innovation, Queensland (2016) Janes Creek Revegetation Project, WetlandInfo website, accessed 20 December 2024. Available at: https://wetlandinfo.des.qld.gov.au/wetlands/resources/tools/wetland-project/janes-creek-revegetation-project-e7ea/ |